Second-Hand Gas Co-Generator
(Article-no.: EAG-45)


Two parallel independenty working lines which produce the steam required for the paper drying. One line is equipped with a gas turbine and a boiler, the other with gas burner and a boiler.
Both lines were built in 2007 and start running in 2009. They were in operation for 52.359 hours and the last inspection was in May 2017.

Line 1


  • Co Generator made CENTRAX LTD England
  • Turbine ROLLS`s ROYs CX501 KB5
  • Boiler Type Ambitermo R3B-e 16 Protugal

Line 2

  • Burner ELCO E10.12000.30G EU2 Germany
  • Boiler Type Ambitermo R3B-e 16 Protugal