Based on the result of the technical audit a budget cost estimation can be established including the following
- Budget cost for engineering check of existing engineering documents
- Budget cost for matchmarking, dismantling, packing, loading and shipment
- Budget cost for overhauling, repair and replacement of defective items
- Budget cost for Basic and Detail Engineering
- Budget cost for erection and commissioning
